Page 45 - THE GLOBAL LEADER IN MEMBRANE SEPARATION INDUSTRY
P. 45

PART 02      Proficient in membrane technology and
                                                    PART 02     Proficient in membrane technology and
                                                                       customized processes as needed
                                                                customized processes as needed



 New energy and environmental protection  Treatment of wastewater from fuel ethanol production

 Zero discharge of iron phosphate wastewater  According to statistics, every ton of ethanol produced produces 20 tons of wastewater. Fuel

               ethanol  wastewater  is  an  organic  wastewater  with  high  concentration,  high  temperature,  high
 At present, the production process of iron phosphate mainly adopts the ammonium method   suspended solids, and complex composition. The wastewater contains a large amount of volatile
 and  sodium  method,  and  each  ton  of  iron  phosphate  produces  50m ~70m   of  production
 3
 3
 wastewater. Iron phosphate wastewater has the characteristics of high TDS, low pH value, high COD,   acids with a pH value of 4-5. Directly discharging these wastewater can cause serious environmental
 high temperature, and high impurity ions (iron, manganese, magnesium, calcium). The traditional   pollution. How to economically and efficiently treat fuel ethanol wastewater has always been one of
 process  for  treating  iron  phosphate  wastewater  has  shortcomings  such  as  poor  pre-treatment   the important challenges that enterprises urgently need to solve.
 efficiency, severe membrane pollution, low product salt quality, unstable reused water quality, and
 high  reagent  consumption.  The  industry  urgently  needs  to  develop  reliable  zero  discharge
 technology for iron phosphate wastewater to ensure the stable operation of the iron phosphate   Main process
 production process.
               Anaerobic Digestion + Two-Stage AO Biochemical Method + MBR + Dual Membrane System
 In  response  to  the  demand  for  zero  discharge  of  wastewater  from  the  production  of  iron   Process + Advanced Oxidation + High-Pressure Reverse Osmosis.
 phosphate, JIUWU HI-TECH has independently developed sedimentation reaction coupled ceramic
 membrane separation technology, deep deionization technology, membrane method acid water
 reuse technology, and efficient membrane integrated concentration technology. It has achieved the   Technical advantages
 successful  operation  of  the  first  domestic  sedimentation  reaction  coupled  ceramic  membrane
 separation zero discharge project for iron phosphate wastewater.
                 · The process has strong impact resistance, impact load resistance, low investment,
                     stable operation, low energy consumption, and can recover energy;
 Technical advantages
                 · Adopting ozone oxidation, hydrolysis acidification, and internal circulation aeration
                    technology in biofilters to ensure the up-to-standard discharge of wastewater;
 · Advanced preprocessing technology:  · It can achieve 70% to 100% wastewater reuse, used for cooling circulating water
   Can reduce metal ions such as calcium, magnesium, iron, and manganese to 1ppm, while       replenishment, boiler replenishment, and generating biogas for recycling.
 effectively removing COD and reducing subsequent membrane system loads;
 · System operation and stable water quality:
    The system is mature, resistant to water quality fluctuations, stable production water quality,
 and conductivity of recycled water ≤ 10 μS/cm;
 · Saving medication costs:
    Efficient reuse of over 80% of acidic washing water, saving a large amount of ammonia reagent
 and sulfuric acid used for pH adjustment;
 · Savings in civil engineering investment:
    The process flow is short, reducing the volume of the reaction tank and reducing the floor area.

























 8000t/d iron phosphate production wastewater   A 20000t/d zero discharge project for iron phosphate
 zero discharge project of a certain enterprise in   production wastewater from a certain enterprise  A 1500t/d fuel ethanol production wastewater deep treatment and water reuse project
 Shandong Province   in Henan Province (Phase I + Phase II)  for a certain enterprise in Hebei Province.




 37                                                                                                              38
   40   41   42   43   44   45   46   47   48   49   50