PART 01     Committed to overcoming difficulties to
                                                                     become leader in the membrane industry





 Project Delivery  Manufacturing



                   JIUWU  HI-TECH  has  advanced  production  and  manufacturing  technology  of  new  materials,
               membrane  modules  and  complete  sets  of  equipment,  with  28000m²  intelligent  membrane  material
 JIUWU HI-TECH has a group of senior industry experts and professional technical personnel   production  base  and  50000m²  modern  equipment  production  plant.  JIUWU  HI-TECH  uses  modern
 who have been practicing in fields such as new energy services, industrial fluid separation, water   professional  production  and  testing  equipment  to  produce  new  materials,  membrane  modules  and
 treatment  and  resource  utilization,  and  industrial  waste  gypsum  resource  utilization  for  many   complete equipment that meet customer requirements. We ensure the timely delivery of products with
 years.JIUWU  HI-TECH  delivers  products  and  solutions  to  customers  perfectly  with  optimized   high quality, and ensure the continuous, stable and efficient production of customers.
 engineering design, diversified supply chain, lean production and manufacturing, complete quality
 management  system,  high-quality  engineering  implementation,  information-based  engineering
 operation, and efficient engineering project management.

 In 2008
 JIUWU HI-TECH earned offcial accreditation
 of ISO9001:2008 Quality Management System

 In 2013
 JIUWU HI-TECH earned offcial accreditation of
  ISO 14001:2004 Environmental management system

 In 2015
 JIUWU HI-TECH earned offcial accreditation of OH&S
 18001 occupational health and safety management system


 Project design  Project Implementation


 JIUWU HI-TECH has a group of experienced professional designers, the average work experience   To  meet  customer  needs,  the  company  has  developed  a  strict  engineering  management
 of more than eight years, covering the process, pipeline, equipment, electrical, automatic control, civil   system,  adopting  a  project  manager  responsibility  system,  and  using  professional  project
 construction and budget and other professional. We adopt the mainstream engineering design tools   management software as information assistance to ensure that responsibilities are assigned to
 and software, and establishes a sound design management system and design integration platform to   each position and person, and project progress is controllable. During the project implementation
 achieve  multi-professional  and  efficient  collaborative  work.In  the  project  plan  and  project   process, safety and quality management is strictly implemented to ensure the safety and quality of
 implementation, we follow the material characteristics according to the site environment, and take   the entire construction process, and to maximize customer benefits.
 the  best  cost-effective  solution  as  the  guiding  principle.We  strictly  prioritize  design  and  combine
 design,  procurement,  and  construction  to  highlight  operability  and  construction  controllability,
 saving investment costs and creating value for customers from the source.